| PRESSURE GROUTING | |
| The most correct or accurate term to describe the same procedure as Slabjacking or Mudjacking. This is a processes of introducing material under a concrete slab through small holes in order to raise the slab or to fill a void. The material may be organic, a fine aggregate mixture such as sand and clay, or a grout which includes cement.
|
|
| Click to Close Window | |